Integrated construction management

To ensure that a building site works properly, and the construction project stays economically viable, the competence of structural design planners and technical building services specialists should be combined, like in integral construction management.

IMPLEMENTATION OF ALL REQUIREMENTS IN A PROFESSIONAL AND ECONOMIC MANNER

Even the best planning can quickly come to nothing if it is not implemented to a high quality, within the defined time schedule and budget, on the building site.

In integral construction management, our experts take care of the client's demands in a professional and economic manner. At the same time, they ensure that the requirements of architectural design are implemented to a high quality.

Our construction management team has competence spanning a range of cost groups – from building construction and building services to the outdoor facilities.

 

Integral construction management

Integral construction management stands for a coordinated, comprehensive overall service from a single source. Using the lean methodology, all construction management services of SIA phases 3-6 are bundled over the entire construction phase from tendering to building operation.

Tendering and awarding of contracts

In order to create real added value in the project, we bring our combined expertise to bear as early as the planning phase. We take over your project in service phase 6 with the tendering of KG 300 and 500 and in service phase 7 with the preparation and participation in the awarding of the contract. In KG 400, we check the plausibility of and optimise the specifications and support the awarding process.

Construction management

Construction management is usually integral. This means interface-free across all SIA phases. Professional commissioning and acceptance management is carried out at the end of the project. The development of documentation during construction ensures the success of the project.

Abrechnung und Controlling

The project controlling team supports the cost processes and creates maximum cost certainty through transparency at all times. Together with the plan review and quality assurance during construction, this enables risk minimisation of the construction project.

Baulogistik

Another key to a successful construction project is the use of structured construction logistics. In order to ensure an optimised construction process, this aspect is already included in the planning phase and managed throughout all phases of the project.

INTEGRAL CONSTRUCTION MANAGEMENT MAKES EVERYTHING RUN SMOOTHLY

Integral construction management is a coordinated and comprehensive overall service from a single source: firstly, our experts prepare the service and performance descriptions for cost groups 300 and 500, verify the descriptions for cost group 400 and reconcile them with the existing cost calculation. Then they evaluate the bids and prepare suggestions for the award of contracts.

We support the client and the project management in the selection of the best bidders by taking part in the contract award negotiations.

After the contracts are awarded, the next step is project monitoring – generally for building and technical service trades and the outdoor facilities. In the field of project monitoring, building logistics has emerged as a separate performance profile. Building logistics services contribute to the smooth operation of building sites with a wide range of requirements for the infrastructure. The aim is to set up the building site in the best possible way, to supply it with the materials required, organize procedures efficiently (lean management) and to ensure conservation of resources and reduction of costs. Our team of experts can implement building logistics concepts in projects which are already in progress, monitor and support their operation or develop a concept which is tailored to the specific needs.

At completion of the project, we carry out a professional commissioning management process, which we design beforehand during the planning and construction process. It is sub-divided into the phases commissioning, acceptance, handover. During the use of the building, we provide support for facility management as needed.

Parallel to this, a team records the implementation defects and monitors the remediation of these defects by all trades. The team responsible for financial project controls monitors and supports the processes through all service phases and cost groups, and creates the best possible cost certainty by providing transparency at an early stage. In combination with the checking of the plans and the ongoing quality assurance throughout the construction process, this minimizes the risks of the building project. In integral construction management, our experts work seamlessly across all project phases and specialist disciplines.

 

MINIMIZED COORDINATION EFFORTS AND RISKS

The fact that we assume the coordination tasks means that the client then has only one contact partner. This significantly reduces the loss of information at the points of contact and minimizes the client's entrepreneurial risk. Our site supervisors come from a single company, speak the same language and work towards the same goals.

For many years we have documented the costs of production of all projects in a database. This means that we can reliably estimate the volume of a project even before the actual planning takes place.

We analyze the results of all participants in the planning process, and in this way, we create a solid basis for the client's decisions. Continuous documentation provides the necessary transparency.

 