Healthcare Buildings

Bispebjerg Hospital, Copenhagen

Client

Bispebjerg Hospital, Copenhagen

Location

Copenhagen, Denmark

Project duration

September 2010 - February 2011 (total: 2010 - 2025)

Gross floor space new buildings

121.000 m²

BGF refurbishment

96.000 m²

As part of a structural reform of health care in Denmark the Bispebjerg and Frederiksberg Hospitals will be combined on the clinic campus in Bispebjerg along with Copenhagen Psychiatric Centre and Bispebjerg Child and Adolescent Psychiatry. The Frederiksberg site will be closed in the medium term. A few of the Bispebjerg Hospital buildings should be retained and other new buildings constructed that functionally integrate into the existing structure.

Additional value

  • Detailed analysis of the spatial situation
  • Tool (Free-D-Modelling) developed to simplify user discussions
  • Framework established for a competitive invitation to tender
  • Space saving and more efficient logistics/communication channels in the spatial organisation thanks to the spatial analysis

Individual services

  • Develop a spatial analysis
  • Project control
  • Develop a concept study

Additional value

  • Detailed analysis of the spatial situation
  • Tool (Free-D-Modelling) developed to simplify user discussions
  • Framework established for a competitive invitation to tender
  • Space saving and more efficient logistics/communication channels in the spatial organisation thanks to the spatial analysis

Individual services

  • Develop a spatial analysis
  • Project control
  • Develop a concept study
Client

Bispebjerg Hospital, Copenhagen

Location

Copenhagen, Denmark

Project duration

September 2010 - February 2011 (total: 2010 - 2025)

Gross floor space new buildings

121.000 m²

BGF refurbishment

96.000 m²

As part of a structural reform of health care in Denmark the Bispebjerg and Frederiksberg Hospitals will be combined on the clinic campus in Bispebjerg along with Copenhagen Psychiatric Centre and Bispebjerg Child and Adolescent Psychiatry. The Frederiksberg site will be closed in the medium term. A few of the Bispebjerg Hospital buildings should be retained and other new buildings constructed that functionally integrate into the existing structure.