Design and consulting services for the renewal of the central storage network for media production technology. When the HFF Munich moved into the new building in the Kunstareal in 2011, extensive initial AV technology was procured and installed under the responsibility of Department II Technology. This initial equipment was to be replaced ten yearslater. Oneparticularfocusofthe design services was thereplacementoftheexistingcentralstorage network. Carrying out an onsitesurvey, followedbyfurther design, implementationplanning, preparation and participation in theawardingofcontracts and sitesupervision. The project was carried out bymacom - Part of Drees & Sommer.
ADDED VALUE
- Increased performance
- Reliability and stability (reduction of the risk of system failures and data loss)
- Future-proofing
- Flexibility and scalability
- Improved collaboration
LEISTUNGEN
- Technology consulting and design
- LPH 3
- LPH 5-7
- LPH 8