REX - Expansion of production of active ingredients + New laboratory building and energy control centre
Additional value
- Overall coordination of simultaneously running projects
- Integration of specific building and laboratory experience into planning and implementation
- Exact adherence to schedule and cost specifications
- High level of quality and efficiency
Individual services
- Cost and planning check
- Contract management
- Schedule planning
- Cost controlling
- Reporting
- Site scheduling management
Client
Rentschler Biotechnologie GmbH, Laupheim
Architect / Planner - Laboratory building
Carpus + Partner AG (general planning)
Location
Laupheim, Germany
Laboratory building - Gross floor space
5,168 m²
Laboratory building - Gross volume
19,955 m³
Project duration
August 2006 – March 2008
In buildings 3 and 4, already existing production rooms were refurbished and expanded into GMP production areas for the purpose of expanding the production of active ingredients. In addition, a new laboratory building was constructed for the purpose of increasing the capacity of the quality control system and concentrating various laboratory at the Laupheim location. Moreover, a new energy control centre was also established to supply the entire plant.