Educational & Research Institutions
WALA new laboratory building, Bad Boll
Additional value
- High standards of sustainability
- The natural environment was minimised to the greatest extent possible
- On target with costs and schedules
- Success in achieving energy usage of around 25 percent less than that required under EnEV (Energy Saving Ordinance) 2014
Individual services
- Feasibility study (design phase)
- Project management
Client
WALA Heilmittel GmbH
Project duration
July 2014 – December 2017
GFA
approx. ca. 9,090 m²
Workplaces
Approx. 180
WALA’s goal was to expand its existing site in Bad Boll by adding modern laboratories and other facilities for some 180 employees. The project created more than 5,000 square meters of floor area, offering ample space – in particular for quality control laboratories and microbiology. As the producer of anthroposophic medicines and natural & biocosmetic products attaches great importance to harmony between humankind and nature, they worked closely with Drees & Sommer to establish the criteria for a sustainable construction process.