© HGEsch
Office Buildings
City Hall Freiburg
Client
City of Freiburg
Architect
ingenhoven architects, Düsseldorf
GFA
24,000 m² administration center
BGF
1.500 m² Kita
Projektlaufzeit
Mai 2013 – Mitte 2017
An innovative City Hall – believed to be the biggest EnergyPlus building in Europe – has been built in the university city of Freiburg. The starting point was an energy concept featuring efcient building services equipment that meets the users’ exacting amenity requirements.
Additional Value
- Thanks to holistic planning and consulting, the client is getting a building that is environmentally friendly and saves money
Individual services
- General Technical Planning
- Building Systems Engineering
- Energy Design
- Building Physics
- Energy Management
- Facade Technology